Interior Design Before Renovation – What Needs to Be Decided in Advance
The best time to make the important decisions about an interior is not during the renovation, but before it begins.
Before construction work starts, the functional layout, furniture, kitchen, electrical and plumbing positions, lighting, materials, ceilings, flooring, budget and sequence of implementation should all be clearly defined.
The more of these decisions are made in advance, the lower the risk of rework, conflicts between different contractors, unnecessary purchases and decisions made under pressure.
Why Should Interior Design Start Before the Renovation?
Renovation is the stage when design decisions begin to turn into physical reality.
If the project has not been developed in sufficient detail, contractors start asking questions from the very first days:
Where will this wall be?
Where will the TV be?
At what height should the socket be installed?
Where will the kitchen be?
Where will the plumbing run?
How will the worktop be illuminated?
What type of ceiling will there be?
How will the flooring terminate?
When these questions do not have answers in advance, the renovation starts determining the interior instead of the interior design project determining the renovation.
1. The Functional Layout Should Be Decided First
Before choosing colours and furniture, it should be clear how the space will be used.
This includes:
the arrangement of the rooms;
the main functional zones;
storage areas;
circulation routes;
the positions of the main furniture;
the relationship between the different rooms.
This is where some of the most important questions are answered:
is there enough space around the bed;
where will the sofa be;
where will the dining table be;
is there enough wardrobe space;
how will we move between the kitchen and the living room;
where will the home office area be.
The functional layout is the foundation on which all subsequent technical decisions are built.
2. It Should Be Clear Which Walls Remain and Which Will Change
Before demolition begins, it should be clear which partition walls will be removed, which new walls will be built and which walls will remain.
This affects:
the electrical installation;
plumbing;
flooring;
the ceiling;
doors;
furniture;
lighting.
When changes affect structural or other specialist elements, the appropriate qualified professionals should be involved.
3. Furniture Should Be Planned Before the Electrical Layout
Sockets should not be positioned randomly along the walls.
They should follow the actual furniture layout.
Before the electrical plan is prepared, it should be clear:
where the TV will be;
where the bedside tables will be;
where the desk will be;
where the sofa will be;
where phones will be charged;
where the robot vacuum cleaner will be positioned;
where the kitchen appliances will be;
where custom-made furniture will be installed.
Otherwise, a socket may be technically installed correctly but end up hidden behind a cabinet.
4. The Kitchen Should Be Designed in Advance
The kitchen is one of the areas with the greatest number of technical dependencies.
Before the renovation begins, the following should be clarified:
the layout of the kitchen modules;
the positions of the appliances;
the sink;
the dishwasher;
the refrigerator;
the oven;
the hob;
the extractor hood;
the sockets;
the lighting;
the plumbing connections.
The kitchen should not have to adapt to randomly positioned connections that have already been installed. A better approach is to coordinate the installations with the kitchen design.
5. Plumbing Positions Should Be Known Before Installation
Moving plumbing connections after part of the renovation has already been completed can be difficult and expensive.
The following should be clarified in advance:
sinks;
showers;
toilets;
washing machine;
dishwasher;
kitchen sink;
water heater, where applicable;
floor drains;
positions of cabinets and sanitary fittings.
6. Lighting Should Follow Function
Lighting should not be designed as the final decorative layer.
Before ceilings and electrical installations are built, it should be clear:
where the general lighting will be;
where task lighting is required;
where accent lighting will be used;
where concealed LED lighting will be installed;
where wall lights will be positioned;
how the different lighting scenarios will be controlled.
Lighting should be connected to the way each area will actually be used.
7. Ceilings Should Be Decided Before the Lighting Is Installed
Suspended and decorative ceilings affect:
lighting fixtures;
LED profiles;
curtains;
air conditioning;
ventilation;
the height of the room.
A change to the ceiling can affect several other systems at the same time.
8. Flooring Should Be Coordinated in Advance
Different flooring materials have different thicknesses, installation methods and transition details.
Before renovation begins, it should be clear:
where parquet or wood flooring will be used;
where porcelain tiles will be used;
where wet areas are located;
how different flooring materials will meet;
whether there are differences in floor levels;
what type of skirting boards will be used;
how thresholds and transitions will be resolved.
9. Doors Should Be Part of the Overall Planning
Doors are often selected too late.
However, their:
dimensions;
opening direction;
height;
colour;
frame;
relationship with wall panels;
can influence the entire interior.
The opening direction should be checked against furniture, circulation routes and light switches.
10. The Bathroom Should Be Designed in Detail
The bathroom is a small space with many interdependent elements.
Before renovation begins, the following should be decided:
the position of sanitary fittings;
the shower area;
niches;
tile sizes and layout;
plumbing connections;
lighting;
sockets;
furniture;
the mirror;
drains.
11. Custom Furniture Should Be Conceptually Resolved
Not all furniture needs to be manufactured before the renovation begins.
However, it should be clear what will be included.
For example:
the kitchen;
wardrobes;
TV units;
entrance-hall furniture;
bathroom cabinets;
bookcases;
workspaces.
This allows construction and electrical positions to be coordinated with the furniture.
12. It Should Be Clear What Will Be Built In
Built-in solutions require early coordination.
For example:
built-in wardrobes;
concealed doors;
niches;
recessed curtain tracks;
recessed lighting;
concealed LED profiles;
decorative wall panels;
technical cabinets.
If these decisions are introduced too late, they may require finished surfaces to be opened up and reworked.
13. Materials Should Be Selected Early Enough
Not every decorative item needs to be chosen before renovation begins.
But the main materials should already be known.
For example:
flooring;
tiles;
paint;
wall finishes;
kitchen materials;
furniture finishes;
worktops;
sanitary ware.
These choices affect dimensions, thicknesses, installation and budget.
14. 3D Visualizations Should Be Used for Evaluation, Not as the Only Project Documentation
3D visualization is an excellent tool for evaluating the design concept.
30. Before Renovation Begins, There Should Be One Overall Picture
The most important thing is not for every individual decision to look good on its own.
It has to work together with everything else.
The kitchen has to work with the plumbing and electrical installations.
The furniture has to work with the sockets.
The ceiling has to work with the lighting.
The materials have to work with the budget.
The dimensions have to work with the actual property.
This is the main value of an interior design project before renovation – coordinating all the individual decisions as one system before implementation begins.
What Is the Correct Order Before Starting a Renovation?
For a complete interior project, the preparation may logically follow this sequence:
The Short Answer: What Should Be Decided Before Renovation Begins?
Before renovation starts, all decisions that affect construction work, installations and furniture should be resolved: the functional layout, kitchen, plumbing, electrical positions, lighting, ceilings, flooring, doors, main materials and custom-made furniture.
The more complex the interior, the more important it is for these decisions to be made in advance rather than gradually during the renovation itself.
Interior Design Before Renovation with Atmosphera
Atmosphera develops complete interior design projects and turnkey implementation in Sofia for apartments, houses, offices and commercial spaces.
The process may include functional planning, interior design concept development, 3D visualizations, technical and working drawings, custom furniture, material selection, budgeting, design supervision and coordination of implementation.
The goal is for key decisions to be made before renovation begins, while changes are still easy to make and do not require already completed work to be demolished.
The project should ideally begin before construction and finishing works, so that the main functional and technical decisions are ready in time.
What should be decided before renovation begins?
The functional layout, kitchen, furniture, electrical and plumbing positions, lighting, flooring, ceilings, main materials and budget should be sufficiently well defined.
Should the kitchen be designed before renovation?
Yes. For a custom-made kitchen, this is strongly recommended because the design determines the positions of plumbing, electricity, appliances, ventilation and lighting.
Should the furniture be selected before the electrical plan?
The basic furniture layout should be known because sockets, switches and lighting depend on how the space will be furnished.
When should materials be selected?
The main materials should be selected early enough so that dimensions, installation, deliveries and budget can be properly planned.
Can renovation begin before all 3D visualizations are ready?
In some cases, yes, but the relevant technical decisions should be completed before the associated construction work begins.
Is a 3D visualization enough to start renovation?
Not for a complex project. Accurate plans, dimensions, positions, specifications and technical details are also required for implementation.
When is the electrical plan prepared?
After the functional layout, main furniture, kitchen and lighting concept are sufficiently clear.
When are the plumbing positions determined?
After the kitchen, bathrooms, sanitary fittings and other areas requiring water supply and drainage have been resolved.
Does everything need to be purchased before renovation?
No. However, it should be clear what will be used and which products have specific dimensions, technical requirements or long delivery times.
When should custom-made furniture be ordered?
The concept and technical requirements should be clear in advance, while the final measurements for some built-in furniture are taken at the appropriate stage after the relevant construction work has been completed.
What happens if we change a decision during renovation?
The change should be evaluated against all related decisions, including installations, furniture, materials, budget and schedule.
Should there be a contingency in the budget?
For a complete renovation, especially in an existing property, it is reasonable to keep a contingency for unforeseen conditions and changes.
How detailed should the project be before renovation?
This depends on the complexity of the property. The more installations, custom furniture and individual solutions there are, the more detailed the documentation should be.
What is the most important decision before renovation?
There is no single answer, but the functional layout is the foundation because the furniture, installations, lighting and many other decisions depend on it.